The following is a brief narrative describing the intended control strategy between each a Reverse Osmosis (RO) train and the water treatment plant SCADA system.
It describes the control system we will supply and outlines the basic operation of a Reverse Osmosis skid and the required handshaking with the water treatment plant SCADA system. This narrative in no way encompasses all of the responsibilities of the water plant SCADA as we are not familiar with all of the requirements of the end user.